Banner Default Image

Deburring

​There are many deburring processes, but the most common are mass-finishing, spindle finishing, media blasting, sanding, grinding, wire brushing, abrasive flow machining, electrochemical deburring, electropolishing, thermal energy method, machining, water jet deburring, and manual deburring.[5]

Manual

Manual deburring is the most common deburring process because it is the most flexible process. It also only requires low cost tools and allows for instant inspection.[6] Manual deburring is either done with tools like scrapers, files, sandpaper, stones and reamers or with handheld power tools that use abrasive points, sandpaper, or cutters similar to those used to deburr during machining.

Electrochemical

Electrochemical deburring is the use of electrochemical machining to deburr precision work pieces and edges that are hard-to-reach, such as intersecting holes. The process uses a salt or glycol solution and electricity to dissolve the burr. The electric current is applied with a specialized tool to reach the burr location. Burrs are removed in 5 to 10 seconds, while the rest of the work piece is unaffected.[6]

Thermal

Thermal energy method (TEM), also known as thermal deburring, is a deburring process used to remove hard-to-reach burrs or burrs from multiple surfaces at the same time. The process uses an explosive gas mixture to provide thermal energy to burn off the burrs. It is the fastest burr removal process, requiring only 20 milliseconds to remove a burr.[7]

The process starts by loading the workpiece into an explosion-proof chamber, which is then sealed and clamped with approximately 220 metric tons (240 short tons). The chamber is then evacuated of air and filled with an oxygen and fuel mix; this mixture is pressurized to 0.5 to 1.9 MPa (73 to 276 psi). An electrical igniter then ignites the mixture, which burns for approximately 20 milliseconds, causing all of the sharp corners and burrs to burn away. The peak temperature reaches 3,000 °C (5,430 °F).[7]

​Canvey Island is a town, civil parish and reclaimed island in the Thames estuary, near Southend-on-Sea, in the Castle Point district, in the county of Essex, England. It has an area of 7.12 square miles (18.44 km2) and a population of 38,170.[1] It is separated from the mainland of south Essex by a network of creeks. Lying only just above sea level, it is prone to flooding at exceptional tides and has been inhabited since the Roman conquest of Britain.

The island was mainly agricultural land until the 20th century, when it became the fastest-growing seaside resort in Britain between 1911 and 1951. The North Sea flood of 1953 devastated the island, killing 58 islanders and leading to the temporary evacuation of the 13,000 residents.[3] Canvey is consequently protected by modern sea defences comprising 2 miles (3.2 km) of concrete sea walls.[4]

Canvey Island is also notable for its relationship to the petrochemical industry. The island was the site of the first delivery in the world of liquefied natural gas by container ship and later became the subject of an influential assessment on the risks to a population living within the vicinity of petrochemical shipping and storage facilities.

Latest jobs