BESA TR19
BESA TR19 are the duct-work cleaning guidelines provided by Building Engineering Services Association (BESA) for internal cleanliness of ventilation systems.[1] The guidelines were introduced in 2005 by amalgamation of pre-existing TR/17 and DW/TM2 guidelines. Once a system is TR19 compliant, it has been found that average total High Risk Combustion Load Levels (HR-CLLs) can be reduced by a total of 83%.[2]
History
The BESA TR19 guidelines were introduced in 2005 by updating the old TR/17 guidelines which were in effect from 1998. In 2014, TR19 was updated to reflect changes in European standard BS EN 15780:2011 – Ventilation for buildings – ductwork – cleanliness of ventilation systems.[3] TR19 was updated to reflect the benchmarks and testing protocols as contained in BS EN 15780.[citation needed] The prime changes in TR19 2005 and 2014 versions are introduction of a CQC, testing protocol and test equipment specification, separation of new duct systems from existing systems and introduction of the RRFSO.[ci
Latest jobs
- Turnaround Project Engineer – Shutdowns / Oil & Gas / Field Service
-
Job location:
Job salary: £60,000 per annum Bonus + 12% Pension + BUPA + Daily oversea allowance
We are recruiting on behalf of a globally recognised engineering organisation specialising in combustion and environ...
- Senior Electrical Project Engineer – Power & Renewable Energy
-
Job location:
Job salary: £65,000 per annum Home based with car allowance + bonus
We are recruiting for a Senior Electrical Project Engineer to support the delivery of complex power generation, renew...
- Mobile Field Service Engineer
-
Job location: Woodbridge
Job salary: 36 - 40K
Mobile Field Service Engineer Permanent | Woodbridge, Suffolk | 40 Hours per Week (Mon–Fri + Callouts & Weekend ...